SAUDI ARABIA - WET PHOSPHORIC ACID PLANT
 
Tekfen Job No   306
 
Location   Ra’s Az Zawr, Saudi Arabia
 
Client   Saudi Arabian Mining Co. - Ma’aden
 
Contractor   Tekfen Construction and Installation Co., Inc. - Litwin Consortium
 
Final Project Value   US$ 522.834.000
 
Tekfen Portion   35,5%
 
Commencement   25/06/2007
 
Completion   30/06/2010
 
Tekfen signs Contract for Ma’aden Wet Phosphoric Acid Plant in consortium with Litwin. The project covers LSTK contract for the engineering, procurement, construction and erection of Wet Phosphoric Acid Plant with a capacity of 4.380 t/day P2O5 as 48% concentrated Phosphoric Acid, together with neutralization unit, its sludge pond and phosphoric acid / sulphuric acid truck and railway car loading station nearby the plant area.

Tekfen is responsible for the whole construction and erection works as consortium partner and is implementing all construction and erection works at site.

HIGHLIGHTS

  • Excavation: 170.000 m3
  • Backfilling: 175.000 m3
  • Piles: 4.200 Nos
  • Structural Reinforced Concrete: 50.000 m3
  • Structural Steel Installation: 9.000 t
  • Piping: 2.100 t
    • CS Pipes: 340 t
    • RLCS Pipes: 1.200 t
    • SS Pipes: 130 t
    • Others: 430 t
  • Equipment Installation: 6.500 t
    • Storage Tanks: 900 t
    • Reactor: 1.100 t
    • Others: 4.500 t
  • Cables: 490.000 m
  • Cable Trays: 380.000 kg