SULTANATE OF OMAN - HARWEEL CLUSTER PHASE II FACILITIES, GAS & OIL PIPELINE
 
Tekfen Job No   299
 
Location   Sultanate of Oman
 
Client   Petroleum Development Oman, PDO - Petrofac
 
Contractor   Tekfen Construction and Installation Co., Inc.
 
Final Project Value   US$ 57.000.000
 
Tekfen Portion   100%
 
Commencement   17/12/2005
 
Completion   31/12/2009
 
Harweel Cluster Phase II, the inaugural contract of Tekfen in The Sultanate of Oman is an EPC development scheme of Petroleum Development Oman.

The main contractor being Petrofac International, Tekfen has undertaken detail engineering and construction works of 168 km of 14 carbon steel (6" to 18" dia.) and corrosion resistant alloy (14" & 16" dia.) flow lines, trunk lines and main pipeline system for gas and oil.

HIGHLIGHTS

18" Oil Export Line: 89 km
16" Gas Export Line: 28 km
10" Gas Injection Line: 7 km
6" Sour Water Injection Line: 4 km
8" Trunkline: 1 km
5 x 6" Gas Injection Line: 11 km
14" & 16" CRA Lines: 28 km